Two new lifts have been announced for Chamonix’s Le Brévent ski area this winter.
The Parsa chairlift has been upgraded to a new, detachable, six-seat chairlift, with the former fixed-grip lift removed.
The Leitner-built lift will cut the uphill ride time to under four minutes and increase capacity on the route to nearly 3,000 people per hour. The old drag lifts will also be replaced by one modern drag lift. The new lifts will mean better skier flow in the sector and better facilities for beginners.